I am trying to run the Timesheet sign-off report from PM->Timesheets-> All Timesheet-> Timesheet -> Print-> Print Timesheet option.
How can I change the "records to include" on the report parameter? For some reason there is an hard coded timesheet number and I see no option to edit the timesheet number. Please help.
Thanks
Ann