Production Estimation Cost calculation from Resource group cost category[Not from Operation cost category]

$
0
0

Is there any options to calculate the cost category from Recourse Group?

My Scenario is:

"Coating" is an operation. This operation is included for product [MFG001 & MFG002]

MFG001 has Coating operation with Resource group [6 labor & 2 machine]]

MFG002 has Coating operation, but different Resource group [4 labor & one Machine]]

So I cannot say that Coating operation cost should come from product Route operation level, while Estimation I need to calculate the cost based on Resource group which I attached in operation requirement