Hi everyone,
Does anybody know what having "200" as a value in the load field means (route details, resource load tab), for a secondary resource. I'm aware that stands for the percentage of maximum capacity that has been reserved. Does this mean that the resource work twice on that specific operation (=for the 200% of his maximum capicity)?
Could you please help me with a real example? That would be greatly appreciate.
Thank you.
Alessandro